What we do

Twelve service lines, one well

In Bangladesh CCDC delivers turnkey drilling with slick line and drill stem testing running alongside it. Behind those scopes stands the full service line of CNPC Chuanqing Drilling Engineering, built over sixty years and more than forty-eight thousand wells.

28,000People across the CCDC group
60+Years in exploration and development
308Drilling rigs, 1,000 to 3,000 HP
48,500+Wells completed for PetroChina, across 124 blocks
25,000+Deviated and horizontal wells drilled
40Hydrocarbon blocks served by our research institute
A CCDC rig standing over a well in Bangladesh

A CCDC rig on a BGFCL field, Bangladesh

01 In Bangladesh

Turnkey drilling

In Bangladesh CCDC works almost entirely turnkey. One contract covers the rig, the crew, the materials and the engineering, so the operator carries a fixed cost and a fixed date rather than day-rate exposure. Five turnkey contracts since 2024 have made CCDC the largest turnkey drilling contractor in the country.

  • Rig, crew, consumables and engineering under a single fixed-price contract
  • Well programme design, drilling, casing, cementing and handover at completion
  • Civil works, camp, logistics and chemical receiving at the wellsite
  • HSE management and well control cover for the full contract period
5Turnkey contracts in Bangladesh
308Rigs in the group fleet
100%Drilling success rate, 15 consecutive years in Turkmenistan

Integrated well construction, delivered by the group

Client / region Period Wells delivered Footage completed
TurkmenistanSince 2008178675,300 m
EcuadorSince 2001114263,417 m
Shell (in China)Since 199971285,300 m
TOTAL (in China)Since 2011196705,600 m
Chevron20224
PetroChina124 blocks48,500+

Records held

  • 1965 — the first horizontal well drilled in the Sichuan Basin, China
  • 2010 — the first shale gas well in China
  • PS-6, 9,026 m — the deepest onshore vertical well in Asia, 2023
  • 5,256 m — the longest horizontal section, in a well 8,528 m deep
  • SY001-X1, 8,600 m — the deepest onshore horizontal well in China
  • H100, 31 wells — the largest onshore cluster platform in Asia
  • ChuanKe-1, designed to 10,520 m — being drilled by CCDC now
CCDC-71 lit up at night on a Bangladesh well site

CCDC-71, working through the night

02 In Bangladesh

Drill stem testing

Drill stem testing is one of two specialist scopes CCDC runs in Bangladesh alongside turnkey drilling. A DST puts the formation on production for a controlled period before the well is completed, so the operator commits to a completion design against measured reservoir behaviour rather than an estimate.

  • Open-hole and cased-hole drill stem testing
  • Downhole pressure and temperature recording, with build-up and draw-down analysis
  • Surface well testing, separation and controlled flaring
  • Deliverability, permeability and skin reported back to the operator
  • Fluid sampling for laboratory analysis
1 of 2Specialist scopes CCDC runs in Bangladesh
Titas · Kamta · SylhetFields where the crews work
CCDC and Bangladeshi crew on the rig floor

The specialist crew on the rig floor

03 In Bangladesh

Slick line operations

The second specialist scope. A dedicated slick line crew moves between the active well sites, running mechanical intervention on wireline without a rig having to be sitting over the well.

  • Gauge and drift runs, and depth correlation
  • Setting and pulling plugs, standing valves and gas lift valves
  • Fishing and mechanical jarring
  • Running downhole gauges for pressure surveys
  • Paraffin and scale cutting to restore flow
A CCDC rig and its support units on a Bangladesh well site

Logging units alongside the substructure

04 In Bangladesh

Mud logging

Mud logging reads the well while it is being drilled: the cuttings coming over the shakers, the gas in the returns, the parameters at the drill floor. On the Titas-31 turnkey contract mud logging runs inside CCDC's own scope.

  • Cuttings description and lithology logs
  • Total gas and chromatographic gas analysis
  • Real-time drilling parameter monitoring and early kick detection
  • Pore pressure interpretation and formation evaluation
  • Daily geological reporting to the operator
Two CCDC rigs working a cluster platform

Cluster platform drilling, Sichuan Basin

05 Well construction

Directional drilling & geosteering

CCDC has drilled more than 25,000 deviated and horizontal wells, concentrated on HTHP, deep, high H2S and shale gas wells. It also builds its own rotary steerable system, CG STEER, rather than renting one in.

  • Cluster platform design and operation, up to 31 wells from one pad
  • Ultra-long horizontal sections held inside the target window
  • Near-bit gamma and near-bit inclination for geosteering decisions at the bit
  • Push-the-bit steering with single and double plunger devices

CG STEER rotary geosteering system

ItemRange / ratingControl accuracy
Nominal outer diameterΦ178 mm
Applicable borehole sizeΦ215.9 mm
Maximum build-up rate15.3° / 30 m
Maximum weight on bit300 kN
Maximum operating temperature150 °C
Maximum tensile strength2,000 kN
Maximum torsion resistance40 kN·m
Well inclination0–180°±0.1°
Orientation0–360°±1°
Near-bit gamma0–500 API±3 API
Near-bit well deviation0–180°±0.03°
Hydraulic unit thrust0–30 kN±0.3 kN
170+Wells run with CG STEER
300,000 mFootage completed by the system
95%+Reservoir exposure rate
3,570 mSingle-trip footage, Qiulin 221-8-H2

Firsts

  • Well Mo3, 1965 — the first horizontal well in China
  • Well BQ111H, 2007 — the first horizontal well in China drilled with gas
  • Well Sam35-1H, 2009 — the first horizontal well in Turkmenistan
  • Ning 209H23-2 — 298 hours of single-trip pure drilling time
  • Yang 101H75-2 — operating at 146.8 °C in deep shale gas
  • Steering services for horizontal wells at the Rechtsa oilfield, Belarus
An automated CCDC drilling rig with pipe handling equipment

Automated pipe handling on a CCDC rig

06 Well construction

Managed pressure drilling

CCDC developed CQMPD-I for wells where the margin between pore pressure and fracture pressure is too thin to drill conventionally. The system has been applied on more than 500 wells, and it is what makes a narrow safe density window drillable instead of a sequence of losses and kicks.

SpecificationValue
Rated pressure at wellhead35 MPa
Throttle operating pressure21 MPa
Wellhead pressure control accuracy±0.1
Bottomhole pressure control accuracy±0.35
PWD formation pressure175 MPa
PWD formation temperature175 °C
Throttle valve driveElectrically operated
Response time≤ 0.5 s
Time from full open to full close< 10 s
500+Wells drilled with CQMPD-I
−85.93%Drilling fluid loss
−89.73%Time spent treating complications
+20%Cementing quality

Turkmenistan, five wells

  • Resolved the narrow safety density window that had been stalling the field
  • Drilling fluid loss cut by 90% against adjacent wells
  • Drilling time in the pay zone shortened by 65%
  • Time spent treating complications down by 95%
A CCDC cementing and stimulation fleet rigged up on a pad

A pumping fleet rigged up on location

07 Well construction

Cementing

Cementing design, field operation, technology research and laboratory testing, backed by 202 cementing units. Slurry densities run from 1.30 to 2.65 g/cm³, which covers everything from a loss-prone shallow hole to an ultra-deep sour gas well.

Technology

  • Anti-channelling technology for gas wells, and reservoirs with a water bed
  • Horizontal sections beyond 2,000 m, and gas well horizontal section cementing
  • Under-balance wells, HTHP wells, small hole sizes and ultra-deep wells
  • Positive and reverse cementing, and low-pressure loss-prone well cementing
  • Geothermal well cementing and multi-tool combinations

Slurry systems for "three-low" tight oil and gas wells

Slurry systemDensityPerformance indicator
Curable pad fluid1.15–1.18 g/cm³24 h strength > 5 MPa
Low density, high strength1.15–1.30 g/cm³24 h strength > 7 MPa, rheological index n > 0.85
High strength and toughness1.90 ± 0.02 g/cm³28 d compressive strength > 40 MPa, elastic modulus < 6 GPa
8,388 mJing 51-29H1, with a 5,256 m horizontal section, the longest cemented horizontal well on land in China
1,182Wells cemented with the "three-high" deep well technology
−78.2%Loss rate on cementing operations
91%Calculation accuracy of the cementing simulation software
A CCDC well site with its mud system and support units

The mud system alongside the rig

08 Well construction

Drilling & completion fluids

The CCDC Drilling Fluid Service Center has more than sixty years behind it, field experience in Turkmenistan, Uzbekistan, Ecuador and Thailand, and two national-level laboratories in Chengdu: one for low permeability reservoirs, one for oil and gas field applied chemistry.

Fluid systems

  • High temperature resistant, to 200 °C
  • Ultra-high density drilling fluid, to 2.65 g/cm³
  • Saturated brine drilling fluid, and clean brine completion fluid
  • Oil based mud and clay-free polymer drilling fluid
  • Shale gas water based drilling fluid
  • Circulation loss control and treatment

On the operators' wells

OperatorResult
Shell China, 2005–20159 rigs and 54 shale gas wells. TD at 5,413 m in 29.8 days with a 1,700 m horizontal by SBM — a best-class record across Shell's global projects.
BP shale gas, 2017–201910 wells. Polymer mud to MW 2.30 SG finished the vertical section in 51 days; OBM at MW 2.35 SG completed a 1,500 m horizontal section.
Chevron (Unocal East), 2010Five wells on non-damage kill mud and NaBr completion fluid.
ANDES, Ecuador, 2014–CQ-GAP environmentally friendly WBM on 120 wells. SACHA290V was drilled in 11.88 days, 5.63 days ahead of design, the shortest drilling period on the field.
Turkmengazi, 2007–The first horizontal well in Turkmenistan, Sa35-1H, on an HTHP saturated brine system at 160 °C and MW 2.42 SG — through 600 m of salt and gypsum in 15 days.
PetroChinaPS-6 at 9,026 m, and SY001-X1 at 8,600 m, both on HTHP water based mud.

What the operators said

  • Shell — Most Improved Contractor, for the SCEPCO Sichuan and Changbe wells
  • BP — premium mud service on the Weiyuan Dong and RCB shale gas projects
  • Chevron — the most progressive and capable Chinese fluid company
  • ANDES — awarded several times for contributions to drilling and completion
Seismic and reservoir studies displayed at a CCDC well site in Bangladesh

Reservoir studies on display at Titas

09 Reservoir & integrity

Geological research

The CCDC Geological Exploration and Development Research Institute is the only overseas natural gas research centre inside CNPC. It is the group's answer to the question that decides a well before the bit turns: where exactly is the reservoir, and how should the well be placed in it.

  • High-definition seismic processing and multi-scale reservoir evaluation
  • Tectonic and stress field models, and formation pressure simulation
  • 3D digital core modelling and mineralogical breakdown
  • Numerical simulation of fracture permeability for brought-in wells
  • Well group deployment design, including spoon-shaped and single-row layouts

Applied in 40 hydrocarbon blocks

73 → 91%Reservoir prediction coincidence rate, P oilfield, Ecuador
57 → 94%High-quality reservoir drilling-encounter ratio, Al-Ahdab oilfield, Iraq
32 → 84%Carbonate reservoir drilling-encounter ratio, right bank of the Amu Darya, Turkmenistan
CCDC-71 and its surface equipment at night

Surface equipment on a live well

10 Reservoir & integrity

Workover & stimulation

Well testing, coiled tubing, fracturing and acidizing, stimulation and workover, run from a fleet of special units that CCDC owns and crews itself.

  • Well testing and surface flow measurement
  • Coiled tubing operations
  • Fracturing and acidizing
  • Stimulation operations on producing wells
  • Workover, including snubbing on live wells

The special unit fleet

Unit typeCount
Fracture unit (2000)172
Fracture unit (2500)112
Fracture unit (1000+700)79
Cementing unit202
Coiled tubing38
Service rig138
Snubbing unit11
A CCDC well control team fighting a wellhead fire

The rescue team on a burning wellhead

11 Reservoir & integrity

Well control emergency response

The CNPC Well Control Response & Rescue Centre, the National Oil & Gas Field Rescue Base, was established in 1994 and is still the only one inside CNPC. It sits within CCDC, which is why a CCDC contract carries well control cover rather than a phone number for somebody else's.

  • Development, review and update of emergency response plans
  • Site operation supervision and technical support
  • Accident and incident investigation and reporting
  • Live well control emergency response and blowout intervention
1994Established, and still the only rescue base in CNPC
1991First deployment: the Gulf War well fires, Kuwait
34.5 g/m³Hydrogen sulphide at Osman-3, Amu-Darya basin, Turkmenistan, October 2006
A CCDC rig on the steppe in Turkmenistan

An EPCC well on the Amu Darya, Turkmenistan

12 Reservoir & integrity

Cooperative energy development

CCDC contracts in whatever shape the operator needs: day rate, cost reimbursement, bundled service, turnkey, EPCC, risk exploration and development, or production sharing. It also owns and produces a gas field of its own, which is an unusual thing for a service company to be able to say.

Weiyuan shale gas block, Sichuan — owned and operated by CCDC

823 km²Total block area, 570 km² of it usable
294.71 bcmProven geological reserves
12.03 bcmProduced to January 2023
295Wells completed, on 50 platforms

EPCC in Turkmenistan

  • Two production capacity EPC projects: 8 billion m³ a year on the Amu Darya, and 10 billion m³ a year at the Galkynysh gas field
  • The "10+2" integrated drilling project and the Nagarachi gas field, against the "six high" drilling challenges of the region
  • Six consecutive lump-sum drilling rounds, more than 190 wells, and a 100% drilling success rate for 15 consecutive years

Bundled service for Chevron, Sichuan

  • An ultra-high sulphur gas field, with rig service, mud logging, TRS, cementing, mud service and coring under one scope

Also within scope

The work around the work

Equipment inspection & HSE consultation

Third-party inspection of drilling and pressure equipment, and HSE consultancy for operators running their own programmes.

Digital & IT based field construction

Digital oilfield construction, and the operations software behind this project: Command, Wellsite and Crew, built for CCDC Bangladesh.

Civil works & camp construction

Location preparation, access, drainage and camp build, carried inside the turnkey scope so the operator receives a finished site.

Materials & chemical logistics

Receiving, storing and moving drilling chemicals and consumables between wells, as at Sylhet-10X for the Dupitila-1X programme.

Get in touch

Tell us about the well

Whether it is a single turnkey well or a full field programme, the project team in Dhaka can scope it and tell you what CCDC would put on location.